Cooling Fan Wiring Harness
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Guangdong
-
Validity to:
Long-term effective
-
Last update:
2020-08-24 01:33
-
Browse the number:
108
+
- Contactaixin:
dgykdz(Mr.)
- Email: telephone: phone:
-
Arrea:
Guangdong
Address:2nd Floor, Building B, Huifeng Industrial Park, No.11 Pujiang Road, Daning, Humen Town, Dongguan City, Guangdong Province, CN
- Website:
+
Product Name |
Cooling Fan Wiring Harness |
Cable |
22 awg*5c |
Cable Color |
black |
Core Color |
black, red, green, yellow, blue |
Housing 1 |
8 circ., pitch: 3 mm; dual row, molex 0430250800 |
Terminal 1 |
20-24awg, molex 0430300007 |
Housing 2 |
2x9 circ., pitch: 2.54 mm, double row, molex 0901420018 |
Terminal 2 |
24awg, molex #0901190109 or #0901190110 , tyu #tu5005t |
Terminal 3 |
2x3 circ., pitch: 2.54 mm, double row, molex 0901420006 |
Material |
PVC |
Test |
100% tested before shipment |
Wiring an electric fan can be easy when you install a Cooling Fan Wiring Harness that we manufacture in-house. Our dual fan wiring harnesses come complete with the proper gauge and color coordinated wire, a temperature sending unit.
The wiring harness is protected by many components. However, care should be taken to position the components where they will be as dry as possible and the least exposed to extreme temperatures.
Production Process
Wire cutting | Terminal crimp | Peeling | Tin plating |
Assembly | Twist | Inspection | Test |
Test Equipment
Good Quality comes from strict control on every process. The best equipment, the excellent technology, make us get a lot of recognition from our customers.
Shipping And Payment
FAQ
Q1. Can you provide the OEM service?
A1: Yes, we can offer the OEM service according to your requires.
Q2. What's the standard of the material quality?
A2: Our material can pass ROHS, Reach, HF.
Q3. Could I have a sample?
A3: Yes, the free sample can be offered but you need pay the cost of freight.
Q4. What is the production time?
A4: Sample time around 3~5 days. And mass production is in 15 days.
Q5. What is the payment term?
A5: Our payment term are TT, western union, Paypal, L/C.
http://www.wiring-harness.net/